In short, I want to make sure I'm setting up the requirements and MasteryPath elements correctly in a module I'm designing. I've spent quite a bit of time reviewing the available official guides and resources from  @kona ‌ (thank you!!)

Here are the things I would like to ensure:

  • students read the information pages
  • move through the unit sequentially
  • they have a choice assignment (GIS 4) using MasteryPaths

My questions

  1. How do I include the GIS 4 assignment in the Module requirements since it is variable by choice? Right now, I have left it out of the requirements list (see image below)
  2. If I want to make sure students must start this module as prescribed, do I click "re-lock" when presented with this decision?

342772_Screenshot 2020-03-26 12.12.46.png

Module Layout

Module design with MasteryPath

Module Requirements

342804_Screenshot 2020-03-26 13.17.43.png

0 Likes
1 Solution
jenna_scheub
Community Participant

I am going to answer my own question! :smileylaugh:

  1. I figured out that the way I had it formatted in the picture above was great. For these assignments, students are submitting a link to their map
  2. Yes, choose to re-lock the modules

View solution in original post